July/August 2016

Surbiton Golf Club

Major drainage works continued on Holes 1 & 2. Some 3,500 linear metres of primary drainage pipework was installed, creating a network of pipes at 5 metre spacing’s within each fairway. The system is complimented by secondary drainage, utilising gravel bands installed at 1 metre spacing’s. Arising’s from the trenchlines was used to improve some golf featuring within the fairways, these areas were topsoiled and seeded.

Back to projects

We have received your enquiry!

Have an Enquiry?

Drop us a line using the form below, and we'll get back to you as soon as we can!