Phase 5 of the drainage works programme continued with primary and secondary drainage systems being installed on the 14th fairway. A testament to the success of the systems is The Club’s continuing investment with Profusion.
In addition the club are investing in Blinder Eco-Path within areas between green and tee and tee to fairway. This phase of works seeing new paths being installed on the 14th and 15th Holes.
Back to projects