Major drainage works commenced on Holes 1, 2 & 3. Some 1,500 linear metres of primary drainage pipework was installed, creating a network of pipes at 5 metre spacing’s within each fairway. A 225mm diameter main drain has also been installed to cope with the surface water cascading across the fairways.
Back to projects