Phase 4 of the drainage works programme continued with primary and secondary drainage systems being installed on the 12th and 15th fairways. A testament to the success of the systems is The Club’s continuing investment with Profusion.
In addition the club are investing in Blinder Eco-Path within areas between green and tee and tee to fairway. This phase of works seeing new paths being installed on the 4th 7th 9th and 16th Holes.