September 2016

Muswell Hill Golf Club

Major drainage works commenced on Holes 1, 2 & 3. Some 1,500 linear metres of primary drainage pipework was installed, creating a network of pipes at 5 metre spacing’s within each fairway. A 225mm diameter main drain has also been installed to cope with the surface water cascading across the fairways.

Back to projects

We have received your enquiry!

Have an Enquiry?

Drop us a line using the form below, and we'll get back to you as soon as we can!