October 2016

Surbiton Golf Club

The final touches of turf being prepared and laid, to finish off our renovation project at Surbiton Golf Club this year. At lot has happened here this year including two full fairways drained (with secondary gravel banding), 10 bunkers re-shaped, blindered and built, as well as many walkways and carries drained, tidied and re-turfed.

Back to projects

We have received your enquiry!

Have an Enquiry?

Drop us a line using the form below, and we'll get back to you as soon as we can!