Our Projects

|January 2017

Ferndown Golf Club

Here we return to work with Murray Long and team to create some fantastic bunkers All with the Blinder Bunker Liner system which works really well with the heather turf A total of 1500m2 of Blinder laid, 1520m of revetted turf laid and 464 tonnes of sand moved into

Read more
January 2017

Fulwell Golf Club

This our first phase of works at Fulwell Golf Club where we will reconstruct 15 bunkers With the hope to go on for a further 3 phases renovating the entire course Working with consultant Greg Evans Profusion hope to improve the look and feel of this parkland course to

Read more
December 2016

The Buckinghamshire Golf Club

Returning for phase 2 of the project and again working alongside Tim Lobb of Lobb & Partners We are now focusing on the second nine holes which includes reconstruction and renovation of 33 bunkers and filling in/reshaping another 26 This dramatically reduces the sand area of the course but with Blinder

Read more
December 2016

Tandridge Golf Club

Tandridge Golf Club is another course that placed into the Surrey countryside that was designed by Harry Colt in 1924 The course has undergone a redesign with architect Frank Pont and we have rebuilt the bunkering complexes around the 3rd and 4th greens Alongside this we have rebuilt the 4th tee

Read more
December 2016

Burhill Golf Club

Profusion Environmental continues its long standing relationship with Burhill Golf Club and Rob Surgey by completing another bunker reconstruction project Using Tim Lobb of Lobb & Partners golf course architecture the continuity of the project shows

Read more
December 2016

Temple Golf Club

Our final drainage job of the year was Temple Golf Club, where we again used our chain trencher to drain 2 greens We also reconstructed greenside bunkers on the 5th and 7th holes These have been reduced in size but also made to fit better with the surrounding landscape

Read more
November 2016

Huddersfield Golf Club

At Huddersfield Golf Club we have again worked with architect William Swan of Swan Golf Designs, and have reconstructed 10 bunkers creating a brand new look Alongside this the team have filled and reshaped 4 more Golf Course Architecture Magazine wrote a great piece about the project here is

Read more
November 2016

Muswell Hill Golf Club

We returned to Muswell Hill Golf Club to commence drainage works on another 5 greens and aprons We used our new Shelton chain trencher with a Kubota 70hp tractor This is both light on the greens but has the required performance to complete a difficult job As many patches within the greens

Read more
October 2016

Moor Park Golf Club

Bunker renovations for another new client With 36 holes and fantastic clubhouse facilities it was a pleasure to work on the courses that were originally designed by Harry Colt in 1923 With Blinder Bunker Liner the bunkers will be much easier to maintain and look great

Read more
October 2016

Stoneham Golf Club

Stoneham Golf Club has been a pleasure to work at this year and we now consider many of the green keepers and staff good friends As well as this some fantastic heathland bunkers have been created These bunkers use a combination of Blinder Bunker Liner and our Heather turf

Read more
October 2016

Chobham Golf Club

Bunker renovations have been completed at Chobham Golf Club Results look fantastic and everyone was very pleased Really good to have the opportunity to work with Swan Golf Designs And our shaper Nathan aka The Welsh Wizard is very happy with the new livery on his Case 130D

Read more
October 2016

Surbiton Golf Club

The final touches of turf being prepared and laid, to finish off our renovation project at Surbiton Golf Club this year At lot has happened here this year including two full fairways drained (with secondary gravel banding), 10 bunkers re-shaped, blindered and built, as well as many walkways and carries drained, tidied and re-turfed

Read more
September 2016

Muswell Hill Golf Club

Major drainage works commenced on Holes 1, 2 & 3 Some 1,500 linear metres of primary drainage pipework was installed, creating a network of pipes at 5 metre spacing’s within each fairway A 225mm diameter main drain has also been installed to cope with the surface water cascading

Read more
September 2016

Stoneham Golf Club

The Bunker renovation programme at Stoneham Golf Club commenced in earnest with 21 bunkers getting the Profusion/Blinder treatment on Holes 1, 3, 4, 5, 13, 14 and 17 Working alongside the greenkeeping team, Renovation includes the re-shaping of the bunkers including earthworks, drainage, installation of Blinder bunker liner,

Read more
September 2016

Chigwell Golf Club

Following a significant rain event in June, major flooding of the car park and pro shop were experienced at Chigwell Golf Club, indeed the flood water was inches from entering the newly renovated clubhouse Drainage specialist Profusion were contacted to find a solution to the problem An innovative

Read more
July/August 2016

Wentworth Golf Club

A major renovation of The West Course is underway at The Wentworth Club Profusion have been chosen to install the unique Blinder Bunker Liner system within each of the 61 bunkers on the newly renovated West Course

Read more
July/August 2016

Surbiton Golf Club

Major drainage works continued on Holes 1 & 2 Some 3,500 linear metres of primary drainage pipework was installed, creating a network of pipes at 5 metre spacing’s within each fairway The system is complimented by secondary drainage, utilising gravel bands installed at 1 metre spacing’s Arising’s from

Read more
June 2016

Wimbledon Golf Club

Major drainage works commenced in June at the time of The All England Club Tennis championships on Holes 1, 3, 4, 14, 15, 16, 17 & 18 Some 6,500 linear metres of primary drainage pipework was installed, creating a network of pipes at 5 metre spacing’s within each

Read more
June 2016

Harpenden Common Golf Club

The Bunker renovation programme commenced in earnest with 6 bunkers getting the Profusion/Blinder treatment on Holes 12 and 15 Renovation includes the re-shaping of the bunkers including earthworks, drainage, installation of Blinder bunker liner, revet edging detail, preparation and turfing

Read more
May 2016

Burnham Beeches Golf Club

Commencement of a programme to renovate the path network around the course commenced with a significant section of path on Hole 12 and 15 Profusion prepared and installed some 200m² of Eco Path on areas known for washing out

Read more
May 2016

Dulwich and Sydenham Hill Golf Club

Phase 5 of the drainage works programme continued with primary and secondary drainage systems being installed on the 14th fairway A testament to the success of the systems is The Club’s continuing investment with Profusion

In addition the club are investing in Blinder Eco-Path within areas between green

Read more
April 2016

Wimbledon Park Golf Club

Profusion’s relationship with WPGC continued with another section of sleeper detail ditch works crossing the around the Spinney adjacent to Hole 3 This work not only provides an outfall for future fairway drainage works but also provides an aesthetically pleasing golf feature

Read more
April 2016

Ashford Manor Golf Club

Phase 3 of the renovation of bunkers continued in April with the renovation of all remaining greenside bunkers, 14 No within the course Renovation includes the re-shaping of the bunkers including earthworks, drainage, installation of Blinder bunker liner, revet edging detail, preparation and turfing

Read more
March 2016

Parkstone Golf Club

Commencement of a programme to renovate the path network around the course commenced with a significant section of path on Hole 12 Prepared by the greenkeeping team, Profusion installed some 300m² of Eco Path on an area known for washing out

Read more
March 2016

Manor House Golf Club

A bunker renovation project is under serious consideration by Manor House GC Profusion working alongside the greenkeeping team renovated a greenside bunker on Hole 10, including re-shaping, drainage, installation of Blinder and preparing/laying turf

Read more
December 2015 – March 2016

The Buckinghamshire

Phase 1 of a major renovation of the course was commenced during December 2015 and completed in March 2016, despite the appalling weather conditions 34 bunkers, reshaping fairways, construction of tees all constructed including earthworks, drainage, installation of Blinder bunker liner, revet edging detail, preparation and turfing The

Read more
November 2015

Wellingborough Golf Club

A two bunker trial renovation was carried out during November which included the shaping preparation and the installation of Blinder bunker liner at the club

Read more
November 2015

Burnham Beeches Golf Club

This phase of the bunker renovation programme saw the completion of the renovation of all greenside bunkers at Burnham Beeches Golf Club In addition the commencement of the installation of Blinder Eco path to steep paths that continually wash out

Read more
November 2015

Tudor Park Golf Club

Profusion’s relationship with the Marriott group continued during November with the commencement of the bunker renovation programme at Tudor Park 6 bunkers have been renovated with the works including earthworks, drainage, installation of Blinder bunker liner, revet edging detail, preparation and turfing

Read more
November 2015

Moor Park Golf Club

Working with the greenkeeping team at Moor Park the bunker renovation programme commenced with the completion of 8 bunkers Shaping was carried out by Profusion together with the installation of Blinder bunker liner During our time on site a trial of Blinder Eco Path was installed A great

Read more
November 2015

Parkstone Golf Club

The final phase of the re-shaping of bunkers was completed by Profusion during a four week window during November

Read more
November 2015

Ferndown Golf Club

Drainage works on a number of holes where completed during November before the rain set in with a vengeance highlighting the need for an efficient primary drainage system Further works completed at Ferndown during our time on site included the shaping of bunkers and laser grading tees

Read more
October 2015

Burhill Golf Club

The bunker renovation programme for The New Course at Burhill continued during October with a further 14 bunkers shaped, drained and lined with Blinder bunker liner

Read more
October 2015

Muswell Hill Golf Club

The success of working with the greenkeeping team was highlighted at Muswel Hill during October  when 4 staff provided by Profusion along with all the specialist machinery required, worked with 4 staff provided by Muswell Hill to complete the drainage works to six of their wettest greens

Read more
August/September 2015

Surbiton Golf Club

Major drainage works commenced in August on Holes 5, 6, 7, & 8 Some 9,700 linear metres of primary drainage pipework was installed, creating a network of pipes at 5 metre spacing’s within each fairway The system is complimented by secondary drainage, utilising gravel bands installed at 1

Read more
September/October 2015

Ashford Manor Golf Club

Phase 2 of the renovation of bunkers continues in September with the renovation of a further 14 bunkers within the course Renovation includes the re-shaping of the bunkers including earthworks, drainage, installation of Blinder bunker liner, revet edging detail, preparation and turfing

Read more
September 2015

Fulwell Golf Club

Following a review of a number of problem tees within the golf course Profusion were selected to carry out the full re-construction of 3 No sets of tees within the golf course Works included excavation and removal of the existing rootzone, creation of a new formation level, installation

Read more
September 2015

Stoneham Golf Club

Following a tender process Profusion have been chosen by Stoneham Golf Club to install pathways throughout the golf course Works commenced in September on Hole 9 to install Blinder Eco Path a natural looking environmentally sound solution for problem paths

Read more
October 2015

Surbiton Golf Club

Following the initial one bunker trial, the commencement of the bunker renovation programme began in October with the re-shaping of bunkers on Holes 2, 4, 6 and 7 Renovation includes the re-shaping of the bunkers including earthworks, drainage, installation of Blinder bunker liner, revet edging detail, preparation and

Read more
June/July 2015

St Georges Hill Golf Club

Profusion’s relationship with St Georges Hill Golf Club continued with the re-construction of Hole 6 Green Course Traditionally one of the wettest greens at St Georges Hill this opportunity was taken to improve the hole with an entire new green complex and approach bunkering Heather was translocated from

Read more
June 2015

Beaconsfield Golf Club

Construction of a large driving range tee utilising artificial turf supplied by Huxley was carried out at Beaconsfield Golf Club including earthworks, construction, formwork, engineered base, topsoiling and turfing the surrounds Artificial turf was supplied and laid by the Huxley Golf team

Read more
April 2015

Dulwich and Sydenham Hill Golf Club

Phase 4 of the drainage works programme continued with primary and secondary drainage systems being installed on the 12th and 15th fairways A testament to the success of the systems is The Club’s continuing investment with Profusion

In addition the club are investing in Blinder Eco-Path within areas

Read more
May 2015

Private client St Georges Hill Estate

Profusion’s relationship with St Georges Hill Golf Club has led to a major landscaping project within the grounds of a private dwelling within the estate Re-shaping the landscape and lawn areas, importing and spreading topsoil and turfing

Read more